1. Safety facilities management of coal mill system
The
coal mill, coal powder bin, dust collector and other places of the coal
powder preparation system are equipped with explosion relief valves;
There
are temperature monitoring devices at the entrance and exit of the coal
mill, temperature and carbon monoxide monitoring and automatic alarm
devices are set on the coal powder bin and dust collector, and gas fire
extinguishing system is set on the coal mill, coal powder bin and dust
collector;
All
equipment and pipes of pulverized coal preparation system are reliably
grounded; Pulverized coal silo, pulverized coal scale, pulverized coal
dust collector and pulverized coal pipeline are adopted to eliminate
electrostatic measures;
The pulverized coal preparation system adopts explosion-proof electrical facilities;
The coal mill system is equipped with dry powder fire extinguishing device and fire water supply device;
The
mechanical transmission parts of the mill and the protection devices on
both sides of the mill body are complete and reliable. The warning
signs around the mill body are complete, and it is strictly prohibited
to pass through the mill body from the bottom of the operation.
Safety facilities are set on the top of the mill to prevent people from falling;
Coal mill area equipment seal intact, no running and leaking;
The
fire retardant breathing valve of the lubricating oil station should be
kept clean and unblocked, and the resistance heater should not be
connected when the lubricating oil temperature is higher than 40
degrees;
Warning
signs including "No fireworks", "Beware of explosion", "Beware of
poisoning", "No kindling" and "No entry for non-staff" have been set up
at the coal mill site. Emergency lights, escape direction signs and exit
signs are complete.
The
coal mill system has a special emergency plan for fire and explosion
prevention to prevent deflagration accidents in the pulverized coal
preparation system;
Qiu site has post safety risk warning card, big risk warning card.
2. Coal mill maintenance operation management
In
the coal mill area gas cutting, electric welding to apply for the
approval permit of fire operation, the site is equipped with fire
fighting equipment;
When
the equipment is being repaired, energy isolation measures such as
"locking up" should be taken to effectively isolate the potentially
dangerous energy, and "No operation" warning board should be hung to ensure the safety of the operation;
In
the coal mill, coal powder warehouse, dust collector, powder separator
work to apply for limited space work approval permit, 30 minutes before
the operation of the gas detection qualified, strictly implement the
"first ventilation, then detection, after operation", maintenance of
temporary lighting selection of 6V safety voltage;
Wear safety belt when working on the mill;
Before
dangerous operations, personnel must carry out safety education and
training, understand the risks and have corresponding preventive
measures.
Dangerous operations must be set up guardians, guardians shall not leave the site, and keep in touch with operators;
Proper use of labor protection equipment.