Lockout tagout program (LOTO) focuses on the following aspects:
Sign production process: set up a working group; Evaluation machine; Prepare drafts of LOTO cards; Hold confirmation meetings; Issue, make and post signs; Conduct acceptance audit.
Lockout/tagout Executor -- To become an authorized officer, you must pass the Lockout/tagout training and theory examination. And after the on-site qualification confirmation; All personnel who need to enter the hazardous area of the equipment are required to Lockout/tagout. These personnel must be authorized to enter hazardous areas of equipment and perform Lockout/tagout.
Lockout tagout Nine steps: Identify energy sources; Notify the affected employees and other personnel; Shut down the device; Disconnect/isolate equipment; Lockout tagout; lockout tagout; Release and control residual energy; Confirm; Implement service/maintenance; Remove /Lockout tagout.
Lockout/tagout (LOTO) Key to success: All employees attach great importance to Lockout/tagout and implement it into action; Lockout/tagout program requires integration with other security management programs; Every detail must be verified on site; Pay attention to the implementation of procedures to audit.