News

You are here: Home » News

LOTO Key Steps 1

  • Publish Time: 2022-06-28
  • Visit: 290

LOTO key steps
The first step:
Prepare to shut down equipment
Area: clear obstacles and post warning signs
Yourself: Are you physically & mentally ready?
Your team mate
mechanical

Step 2: Turn off the device
Authorized person: must disconnect power or shut down machinery, equipment, processes or circuits in accordance with established procedures.
Operator or technician: May need to shut down the machine sequentially to ensure reduction of potential hazards and machine damage.

LOTO procedures or standard operating procedures
Operator/manager participation
Guidance provided by the manufacturer
The employee responsible for shutting down the equipment shall perform or assist in the shutdown

Step 3: Isolate the power source of the device
Disconnect equipment from all external hazardous energy sources
Find all the energy isolators listed in the LOTO program
Adjust these devices to stop the energy flow of the device
PPE may be required
Common energy isolation techniques: close the valve and open the circuit breaker
All operational controllers must be turned off or returned to neutral by authorized personnel. Energy isolators must be used to prevent others from unintentionally opening valves, triggering switches, or performing other operations on equipment/systems.
Energy isolation requires that switches, valves and other controls be in separate or closed positions.

Dingtalk_20210911102714


Previous:
What is the difference between lockout and tagout?
Next:
LOTO Key Steps 2