News

You are here: Home » News

Lockout Tagout Step - Seven steps

  • Publish Time: 2022-04-30
  • Visit: 339

Lockout Tagout Step - Seven steps


"Don't underestimate this Lockout tagout, in the construction site, some springs, flywheel, pressure fluid, gas, capacitor or heavy weight in the energy, sometimes harm to the operator, must pay attention to! This Lockout tagout can be simplified to 'seven steps', namely identify, notify, close, Lockout tagout, test, repair, remove. In this way, it is easy to understand, simple and easy to operate, so that every employee can master the operation procedures of Lockout Tagout and reduce the safety risks in maintenance operations."
This is the site of Ma Tan 1 well constructed by S06299 team of oil test project Department of Downhole Operation Branch. Zhang Jinbao, the team leader, is maintaining the air compressor while popularizing the importance of Lockout tagout to the employees in construction operations.
In order to ensure that the implementation of the "seven-step method" is not discounted, the team implements the "no supervision, no operation" management method, requiring the staff in Lockout tagout, must have a guardian on-site record assessment, so that the "operation according to the chapter is not out of form" has become the behavior of the staff. The team has maintained a zero accident record since its formation.

Dingtalk_20220430141355

Previous:
Does the figure 8 blind need Lockout tag when it is in pass-through state?
Next:
Energy isolation cases in cement enterprises