Lockout Tagout Job security 1
High-risk operations and Lockout tagout
1. Isolation warning should be set at high-risk operation site: 1-1.2m above the ground
2. Warning signs: Warning signs should be set up in combination with isolation warning to inform the guardian not to enter without authorization.
No one is allowed to cross the police line without permission
Warning tape and signage must be installed in the working area
Tools, labor protection supplies, etc., should be prepared and placed at a fixed point
Keep the work site clean and tidy
Ticket display: operation ticket should be placed in a prominent position to facilitate the surrounding personnel and operators to obtain operation information, such as: what operation, which department, who is operating, what is the harm.
Work permits should be posted in the work area
Guardianship personnel should wear armbands or reflective vests to distinguish them from operators
Guardianship personnel shall perform their guardianship duties and shall not leave their posts or do other work.
Monitoring personnel must be provided on site